OCCUPATIONAL SAFETY AND HEALTH
Instructions for labor protection during the operation of group cylinder installations of liquefied gas Occupational Safety and Health / Standard instructions for labor protection Safe Operation 1. General requirements for labor protection 1.1. This instruction contains requirements for ensuring the safe operation of group cylinder installations and is compiled on the basis of the standard instructions of the Gosgortekhnadzor of the Russian Federation. 1.2. Persons at least 18 years of age who have undergone special training, a medical examination, and have a photo ID for servicing liquefied gas cylinder installations are allowed to service group cylinder installations. 1.3. Re-inspection of personnel servicing group cylinder installations is carried out at least once every 12 months. 1.4. Preventive maintenance is carried out by mechanics of the gas industry trust in the presence of the person responsible for safe operation - once a year. 1.5. There should be a logbook on the territory of the group cylinder installation, in which each visit by the group to the cylinder installation should be noted. 1.6. Unauthorized persons are not allowed access to the group balloon installation. 1.7. The area of the group cylinder installation and passages must be kept properly clean. 2. Preparing the unit for operation 2.1. The group cylinder installation should be located in places with convenient access for vehicles. 2.2. The installation must have barriers made of non-combustible materials and the inscription "Gas - flammable". 2.3. Fire-fighting equipment (a box of sand, a shovel, a shield with fire-fighting equipment) must be located within the fence. 2.4. Instructions for the safe operation of a group cylinder installation must be posted in a visible place. 2.5. The group cylinder installation must be locked, the keys must be kept by the person responsible for the gas industry and one copy each in the operational service of the gas industry trust. 2.6. The group cylinder installation must be painted and equipped with instrumentation and serviceable pressure gauges. 3. Rules for changing cylinders 3.1. Change of empty cylinders is carried out during the daytime. There should be no strangers on the premises during cylinder replacement. 3.2. Check that there are no open flames within a radius of 15 m 3.3. Parking of a "CAGE" type vehicle is permitted at a distance of 10 m from residential buildings. 3.4. When transporting cylinders from machines to the installation site is prohibited.
3.5. Replacement of cylinders must be done one by one, for this purpose it is necessary.
3.1. Boiler kindling should be carried out only if there is a written order in the shift log of the person responsible for the gas economy. The order must indicate the duration of the kindling, the time, who is to carry out the kindling. 3.2. The kindling of the boiler must be carried out within the time set by the head of the boiler room, with low fire, reduced draft. When kindling the boiler, it is necessary to ensure uniform heating of its parts. 3.3. The burner of a gaseous boiler must be ignited in the following sequence:
When lighting the burner, you should not stand against the peep hole, so as not to get burned from a flame accidentally thrown out of the firebox. The operator must be provided with safety glasses. 3.4. It is forbidden:
3.5. When kindling, it is necessary to control the movement of the boiler elements during thermal expansion. 3.6. Monitor the water temperature leaving the boiler; it should not exceed 115°C. Keep the outlet water temperature according to the schedule, i.e. depending on the outside air temperature. 4. Boiler operation 4.1. During duty, the personnel of the boiler room must monitor the health of the boiler (boilers) and all equipment of the boiler room, strictly observe the established mode of operation of the boiler. Faults detected during the operation of the equipment should be recorded in a shift log. Personnel must take corrective action. If it is impossible to eliminate the malfunctions on your own, then you must inform the head of the boiler house or the person responsible for the gas management of the boiler house. 4.2. Particular attention must be paid to:
4.3. Checking the serviceability of the pressure gauge using three-code taps and checking the serviceability of the purge safety valve should be carried out by the operator monthly and recorded in the shift log. 4.4. When working on gas fuel, to increase the load, you should constantly add first the gas supply, then air and adjust the draft. To reduce - first reduce the air supply, then gas, and then adjust the vacuum. 4.5. If all or some of the burners go out during boiler operation, the gas supply to the burners should be immediately cut off, the furnace and burners ventilated, and the blow-off candle opened. Find out and eliminate the cause of the violation of the combustion regime and proceed with kindling according to the established scheme. 4.6. During the operation of the boiler, it is forbidden to caulk the seams, weld the elements of the boiler. 4.7. All devices and devices for automatic control and safety of the boiler must be maintained in good condition and regularly checked, within the prescribed time limits, by the administration. 5. Emergency shutdown of the boiler 5.1. If a failure of the safety valve is detected. 5.2. When all circulation pumps stop working. 5.3. When the torch goes out, one of the burners. 5.4. With a decrease in vacuum less than 0,5 mm of water. Art. 5.5. If detected, cracks, bulges, gaps in welds will be found in the main elements of the boiler. 5.6. When the power supply is interrupted. 5.7. In the event of a fire that threatens the operating personnel and the boiler. 5.8. When the temperature of the water behind the boiler rises above 115°C. The reasons for the emergency shutdown of the boiler must be recorded in the shift log. In case of emergency shutdown of the boiler, it is necessary:
In the event of a fire in the boiler room, the personnel must call the fire brigade and take all measures to extinguish it without stopping monitoring the boilers. 6. Boiler stop 6.1. It is produced only on the written order of the boiler house responsible for the gas economy. 6.2. Gradually reducing the supply of air and gas, close the valve on the burner, open the purge candle and close the valve on the gas pipeline. 6.3. Ventilate the furnace and gas pipelines. 6.4. Close the valve at the water inlet and outlet of the boiler. 6.5. If there is no other boiler in operation, stop the circulation pump. 6.6. Make an entry in the shift log when the boiler stops. 7. Final provisions 7.1. The administration of the enterprise should not give instructions to the personnel that are contrary to the instructions and may lead to an accident or an accident. 7.2. Workers are liable for violation of the instructions relating to the work they perform in the manner prescribed by the internal labor regulations and the criminal code of the Russian Federation. We recommend interesting articles Section Standard instructions for labor protection: ▪ Operation of wells equipped with rodless pump units. Standard instruction on labor protection ▪ Working on flexographic printing machines. Standard instruction on labor protection See other articles Section Standard instructions for labor protection. Read and write useful comments on this article. Latest news of science and technology, new electronics: Artificial leather for touch emulation
15.04.2024 Petgugu Global cat litter
15.04.2024 The attractiveness of caring men
14.04.2024
Other interesting news: ▪ Komatsu Electric Micro Excavator ▪ Access to smart home systems from the car ▪ Airless tires of the future from Michelin News feed of science and technology, new electronics
Interesting materials of the Free Technical Library: ▪ section of the site Security and safety. Article selection ▪ article Tubular shovel. Drawing, description ▪ Why do we celebrate New Year's? Detailed answer ▪ Lotus article. Legends, cultivation, methods of application
Leave your comment on this article: All languages of this page Home page | Library | Articles | Website map | Site Reviews www.diagram.com.ua |