OCCUPATIONAL SAFETY AND HEALTH
Instructions for labor protection when working on a centrifuge Occupational Safety and Health / Standard instructions for labor protection Safe Operation 1. General safety requirements 1.1. Physically healthy people who do not have medical contraindications, who have undergone on-the-job training, introductory and primary instruction at the workplace, and must also undergo hygienic training and pass a test once every 1 years according to the established program, should be allowed to work on the centrifuge. 1.2. Personnel working on the centrifuge must know:
1.3. Personnel admitted to work must be provided and familiarized against signature with the instruction on labor protection. 2. Safety requirements before starting work 2.1. Wear the proper attire. 2.2. Check the presence and serviceability of the grounding of the centrifuge and make sure that it is in good condition and test it at idle, if damage or malfunction is found, notify the management. Grounding of the centrifuge is carried out by the grounding contact of the power cord plug. The grounding contact of the socket must be connected to the protective earthing line. 2.3. Check that the aisles are not obstructed. 2.4. To ensure safe operation, it is necessary to carry out a weekly preventive inspection of devices and equipment that do not have a regulated maintenance period. 2.5. Movable and rotating parts of the equipment must have protective covers and guards that exclude the possibility of injury to operating personnel. 2.6. Place the centrifuge on a flat horizontal surface 2.7. Set the speed switch to the desired speed. 2.8. Remove the centrifuge cover. 2.9. Place the sleeves with the centrifuge into the test tube holder slots. 2.10. Close the centrifuge lid. 3. Safety requirements during work 3.1. Do only the work assigned to you 3.2. Be careful not to distract yourself and do not distract others from work. 3.3. Keep unauthorized persons away from the centrifuge. 3.4. Close the lid before switching on. 3.5. Start the centrifuge in operation, making sure that there is no danger to others. 3.6. The centrifuge must be switched on by pressing the power switch, and the indicator light should turn on, indicating the value of the set speed level. The tube holder will begin to rotate and smoothly reach the set frequency. 3.7. When installing sleeves in a test tube holder, it is necessary to ensure that the difference in masses of diametrically opposite sleeves filled with centrifuged material should not exceed 2 g. 3.8. When using glass test tubes, the latter must be installed in sleeves of the appropriate shape. 3.9. If a malfunction is detected in the operation of the centrifuge, stop it, inform the master. Turn on the centrifuge, after troubleshooting, only in the presence of a master and a locksmith. 3.10. It is forbidden to disturb the operation of the centrifuge lock. 3.11. Do not centrifuge with the cover removed. 3.12. Perform cleaning, washing, centrifuges only when the equipment is completely stopped and the electric current is turned off. 3.13. Keep the workplace clean, clean up spilled liquids in a timely manner, and eliminate the slipperiness of the floor. 4. Safety requirements in emergency situations 4.1. If voltage is detected on the metal parts of the equipment (sensation of electric current), the electric motor is running in two phases (humming), the ground wire is broken, you should stop the machine and immediately report this to the management. 4.2. If a malfunction is detected in the operation of the equipment, a spontaneous stop, an accident, it is necessary to turn off the power supply, inform the responsible person about this and do not turn on until the malfunction is eliminated. If acid gets on the skin, immediately wash off with water and 3% alkali solution. 4.3. In case of injury, contact the first-aid post and notify the management. 4.4. If a fire is detected, it is necessary to call the fire brigade by phone 01, notify the management. 5. Safety requirements at the end of work 5.1. Upon completion of work, all equipment and mechanisms are transferred to a position that excludes the possibility of their launch by unauthorized persons, the power supply is turned off, the equipment is wiped. Sanitization, disassembly, cleaning and washing are carried out only after disconnecting the equipment from the mains. 5.2. Take off overalls, report all remarks in the operation of the installation to your supervisor, do not repair the equipment yourself, take a shower. We recommend interesting articles Section Standard instructions for labor protection: ▪ Retail worker. Standard instruction on labor protection ▪ Loading and unloading, moving and storing materials. Standard instruction on labor protection ▪ Car washer. Standard instruction on labor protection See other articles Section Standard instructions for labor protection. Read and write useful comments on this article. Latest news of science and technology, new electronics: Artificial leather for touch emulation
15.04.2024 Petgugu Global cat litter
15.04.2024 The attractiveness of caring men
14.04.2024
Other interesting news: ▪ Li-ion battery capacity doubled ▪ The danger of too much sleep News feed of science and technology, new electronics
Interesting materials of the Free Technical Library: ▪ section of the site Security and safety. Article selection ▪ article Economics of real estate. Crib ▪ article How to recognize a left-hander? Detailed answer ▪ article Sedum rocky. Legends, cultivation, methods of application ▪ article Infrared port for a computer. Encyclopedia of radio electronics and electrical engineering
Leave your comment on this article: Comments on the article: a guest It is not necessary for personnel working on the centrifuge to know how to troubleshoot, as they are not allowed to repair or troubleshoot themselves. Throughout the text, the centrifuge is called either equipment or installation, it is necessary to decide on the terminology. According to clause 2.2, it is not clear how to check the serviceability of the grounding, for this you need at least to measure its resistance or establish that there is a break. All languages of this page Home page | Library | Articles | Website map | Site Reviews www.diagram.com.ua |