1. General safety requirements

1.1. Men at least 18 years of age who have passed a medical examination and are found fit for steeplejack work are allowed to carry out work on the construction and repair of pipes, after having been trained in the profession of pipe laying under a special program and receiving the appropriate certificate.

1.2. Before starting work at a new place, the pipe fitter must be familiarized with the design of the work for signature during briefing at the workplace.

1.3. The pipe fitter must know the production instructions for technical equipment for the mechanic and auxiliary workers.

1.4. After installing a mine hoist or jib crane, the pipe maker is required to take part in their testing. Without testing and drawing up an appropriate report, their operation is not allowed.

1.5. Work on repair and disassembly of pipes must be carried out according to the work permit and in accordance with the work plan.

1.6. When manufacturing and installing fingers and the flooring of the internal adjustable working platform, materials must be used in accordance with the PPR. The working platform must be tested after the first installation. When constructing pipes using a jib crane, it is necessary to have two working platforms (grids), spaced 1,2 m from each other.

1.7. Pipe laying and jointing should only be done from work sites. Masonry from the wall is allowed if its thickness is at least 3 bricks, and the pipelayer must be secured with a safety belt using a cable with a diameter of 6-8 mm, tied to one of the internal running brackets, but not higher than the 3rd from the top of the masonry, or design of a mine hoist (jib crane).

1.8. Ascent to and from the pipe is carried out using external running brackets, which, as the pipe grows, must be protected with strip iron, according to the work plan.

1.9. Do not touch or stand on the top brace.

1.10. To safely cross the edge of the pipe, the pipe maker must use a movable fence PBP-1l, tested with a rope with knots and a 6-8 mm cable with a loop, which must be secured to the structure of the lift or to the third bracket from the top.

The lead pipe maker must be the first to ascend the pipe and the last to descend.

Simultaneous lifting or lowering of several pipelines from the pipe is prohibited.

1.11. Cantilever beams of traffic light platforms are laid in the masonry to a depth of at least 250 mm. To hold them in a horizontal position, it is necessary to use vertical brackets laid to a depth of at least 4 rows of masonry or braces attached to a shaft hoist.

1.12. When working, you should use only a serviceable tool that is well-filled and securely attached to the handles. It must be carried and kept in special boxes or bags.

1.13. The pipe fitter's workplace must be kept clean. Place broken bricks, crushed stone and debris from the top of the pipe in containers; dumping them is prohibited. As a rule, brick cutting should be done at the bottom.

1.14. The pipe-layer must firmly know the coded signals: “Rise”, “Descent” and “Stop”.

1.15. to work as a fire retardant and slinger according to the appropriate program, passing exams and obtaining a certificate for the right to perform these works.

1.16. The installation (dismantling) of the shaft hoist and anti-corrosion protection of pipes can be carried out by the pipe fitter after receiving additional instructions on technical equipment from the foreman, and must be carried out in accordance with the instructions set out in the work project, which the pipe fitter must obtain from the foreman.

1.17. Material should be placed evenly on work sites in accordance with the work plan.

Site overloading is prohibited.

1.18. It is prohibited to climb the pipe and work on it: during a thunderstorm, heavy rain, ice and snowfall, and during wind speeds of 15 m/sec or more.

2. Pipe laying safety requirements before starting work

2.1. Together with the mechanic, check the technical condition of the mine hoist and electric winch, paying special attention to the operation of the brakes, the condition of the steel rope, lifting devices and containers.

2.2. Check that the auxiliary workers have helmets and the required protective clothing. Explain to them the procedure for loading containers with mortar and bricks and what precautions they must take when lifting a load with a jib crane or when loading a mine hoist cage.

2.3. Check the knowledge of the mechanic and auxiliary workers of the coded signals: “Rise”, “Descent”, “Stop”.

2.4. Put on a safety belt before lifting to work.

2.5. Check the serviceability of the working platform and the jib crane.

2.6. The pipe fitter should not start work if, during the inspection, defects are discovered that, in his opinion, can lead to an accident or accident. If it is impossible to eliminate them on your own, the pipe maker is obliged to inform the foreman about this.

3. Requirements for the safety of the pipeline during operation

3.1. While working on pipe construction, the pipelayer must strictly follow the instructions set out in this section of the instructions and in the work plan.

3.2. When constructing chimney brick pipes using a jib crane, be guided by the following:

  • construction of pipes using a jib crane equipped with a limit switch, with the installation of internal adjustable working platforms, is allowed for pipes up to 60 m high, the upper internal diameter of which does not exceed 2,1 m;
  • When accepting a load, be sure to secure yourself with a safety belt for the internal bracket (third from the top) of the shaft hoist structure or for the crane-jib coupling. To pull up the load, use a special hook with a smooth handle;
  • placing a container with bricks or a tub of mortar on the pipe wall is prohibited;
  • carefully monitor the lifting of the load and, if necessary, give signals to the mechanic to stop lifting;
  • the jib crane should be repositioned under the direct supervision of the leading pipe layer, and insurance with a safety belt is mandatory;
  • In all cases, the jib crane is installed in internal running brackets and must be wedged in at least three (counting every other) brackets, except for the top one;
  • The internal adjustable platform is made of boards and panels placed on fingers. The ends of the fingers must rest on a tie row located at least two rows below the edge of the masonry and extend into the masonry at least 120 mm. The span between the fingers should be twice as large as the distance from the middle of the finger to the masonry, so that the deck panels cannot overturn. For safe work, it is necessary to have two sets of fingers with flooring;
  • Sealing of finger sockets is carried out from special scaffolds suspended on strings from the fingers.

3.3. In case of any ambiguities or difficulties in the work, the pipe fitter must stop working and contact the foreman (foreman) and receive additional instructions from him.

3.4. When supplying materials to the pipe using a shaft hoist, be guided by the following:

  • follow the instructions set out in the general provisions in paragraphs. 2.5. and 2.6. this instruction and in the work project;
  • when building up the lift shaft, as well as when dismantling it, you should follow the instructions for installing and dismantling the shaft lift; lift the head when the brick and mortar are exhausted;
  • lifting and lowering people into the mine hoist cage, as well as along steel ropes, crossbars and braces is prohibited;
  • The flooring of the working platform should be made without targets from edged pine boards with a thickness of at least 40 mm. When lifting the head, make sure that the working platform does not jam in the pipe, and that the gap between the edge of the platform and the masonry does not exceed 100 mm;
  • unloading of materials onto the working platform is allowed only after installing the cage on the support cams;
  • make sure that the openings in the places where the cage is loaded and unloaded during its raising or lowering are constantly closed with doors. They are only allowed to be opened at the time of loading or unloading;
  • entering the lower part of the lift shaft to center the pipe is permitted only after installing the raised cage on the landing cams and with the plumb line lowered to the bottom;
  • raising and lowering the cage with the trolley is permitted only after installing stops that protect the trolley from spontaneous shifting;
  • categorically prohibit the admission of unauthorized persons to the danger zone.

3.5. When performing lining, after finishing laying the pipe shaft, the head of the shaft hoist is lowered on screws to the bottom of the pipe. When the gap between the edge of the platform and the masonry reaches more than 300 mm (when lowering the head), a strong fence with a height of at least one meter must be made along the perimeter of the platform. The work site is rebuilt and tested.

3.6. When installing tie-down ruts, the pipelayer must be guided by the following:

  • before installation, check the passport for compliance with the technical conditions for their manufacture;
  • check that the brackets are in good condition and have stops that prevent the floor panels from moving;
  • the distance between the brackets should be no more than 600 mm, and it is prohibited to hang the brackets on turnbuckles;
  • during the installation of rings, brackets, flooring panels, decking and fences of traffic light areas, as well as when painting them, it is necessary to be constantly secured with a mounting belt for the bypass cable attached to the outer running brackets;
  • When moving the scaffolding to another tier, fold the shields or flooring boards flat. It is prohibited to lean them vertically against the pipe.

Hanging the brackets onto the clamping ring is only permitted after the bolts have been fully tightened.

The tightness of the tightening bolts is checked by inspection and by tapping with a heavy hammer:

  • lifting the ring links should be done by pulling them using a strong rope;
  • When rearranging brackets and flooring, start from the running brackets. Excess brackets should be lowered down;
  • In case of strong wind, rain, ice and poor visibility, installation of rings should be stopped.

4. Safety requirements after finishing work

4.1. Clear the workplace of debris and broken bricks, load them into the bucket and lower them down.

4.2. Collect the tool in a box, lower the faulty tool down.

4.3. When descending from the pipe, be sure to use a safety belt, a safety rope and a rope with knots.

 We recommend interesting articles Section Standard instructions for labor protection:

▪ Locksmith-grinder. Standard instruction on labor protection

▪ Transportation of people by road. Standard instruction on labor protection

▪ Vulcanizer. Standard instruction on labor protection

See other articles Section Standard instructions for labor protection.

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Artificial leather for touch emulation 15.04.2024

In a modern technology world where distance is becoming increasingly commonplace, maintaining connection and a sense of closeness is important. Recent developments in artificial skin by German scientists from Saarland University represent a new era in virtual interactions. German researchers from Saarland University have developed ultra-thin films that can transmit the sensation of touch over a distance. This cutting-edge technology provides new opportunities for virtual communication, especially for those who find themselves far from their loved ones. The ultra-thin films developed by the researchers, just 50 micrometers thick, can be integrated into textiles and worn like a second skin. These films act as sensors that recognize tactile signals from mom or dad, and as actuators that transmit these movements to the baby. Parents' touch to the fabric activates sensors that react to pressure and deform the ultra-thin film. This ... >>

Petgugu Global cat litter 15.04.2024

Taking care of pets can often be a challenge, especially when it comes to keeping your home clean. A new interesting solution from the Petgugu Global startup has been presented, which will make life easier for cat owners and help them keep their home perfectly clean and tidy. Startup Petgugu Global has unveiled a unique cat toilet that can automatically flush feces, keeping your home clean and fresh. This innovative device is equipped with various smart sensors that monitor your pet's toilet activity and activate to automatically clean after use. The device connects to the sewer system and ensures efficient waste removal without the need for intervention from the owner. Additionally, the toilet has a large flushable storage capacity, making it ideal for multi-cat households. The Petgugu cat litter bowl is designed for use with water-soluble litters and offers a range of additional ... >>

The attractiveness of caring men 14.04.2024

The stereotype that women prefer "bad boys" has long been widespread. However, recent research conducted by British scientists from Monash University offers a new perspective on this issue. They looked at how women responded to men's emotional responsibility and willingness to help others. The study's findings could change our understanding of what makes men attractive to women. A study conducted by scientists from Monash University leads to new findings about men's attractiveness to women. In the experiment, women were shown photographs of men with brief stories about their behavior in various situations, including their reaction to an encounter with a homeless person. Some of the men ignored the homeless man, while others helped him, such as buying him food. A study found that men who showed empathy and kindness were more attractive to women compared to men who showed empathy and kindness. ... >>

Random news from the Archive

Xiaomi Walkie-Talkie 3 13.04.2022

Xiaomi has released a third-generation right called the Xiaomi Walkie-Talkie 3, which is on sale in China for $62, offering several improved features including full Netcom 4G support. Netcom's full 4G support extends to the top three carriers in China. This feature allows you to establish communication at a distance of up to 5000 km throughout the country.

The walkie-talkie has different functions and supports over-the-air updates at the same time, which may add more functions in the future.

Xiaomi Walkie-Talkie 3 supports various intercom methods, including face-to-face intercom, multi-person communication, and two-way voice calls. The walkie-talkie is equipped with a high-performance audio system, consisting of a large-sized 40mm speaker and a professional sound processing chip, which provides a 30% increase in volume compared to previous models. There is also an environmental noise reduction algorithm that reduces distortion by 10,9%.

Xiaomi Walkie-Talkie 3 has a built-in 3000mAh battery that can last up to 100 hours of standby time and can also be used up to 60 hours. The device is charged via USB-C.

The novelty is equipped with a 2-inch color screen, meets the degree of protection IP54 and is equipped with a built-in rear clip. There is a 3,5 mm jack and the ability to connect to Bluetooth headsets.

Other interesting news:

▪ Google Stadia

▪ Miniature receiver EagleTec

▪ Profits from the sale of World of Warcraft servers will go to charity

▪ A new type of artificial leather

▪ PNY CS900 960 GB Solid State Drive

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ section of the site Application of microcircuits. Article selection

▪ article by Nesolono slurping. Popular expression

▪ article Are the modern Olympics similar to the ancient Olympics? Detailed answer

▪ article Tricycle Triad-350. Personal transport

▪ article Glossary of terms of access control and management system (ACS). Encyclopedia of radio electronics and electrical engineering

▪ article Merging paper. Focus Secret

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024