1. General requirements for labor protection

1.1. This instruction contains requirements for ensuring the safe operation of steam and hot water boilers and is compiled on the basis of the standard instructions of the Gosgortekhnadzor of the Russian Federation

1.2. Boiler servicing is allowed for persons not younger than 18 years of age who have undergone special training, a medical commission, who have a certificate with a photograph for the right to service natural gas boilers.

1.3. Re-inspection of the boiler room personnel is carried out at least once every 12 months.

1.4. When taking on duty, the personnel are obliged to familiarize themselves with the entries in the log, check the serviceability of the equipment and all boilers installed in the boiler room, gas equipment, the serviceability of lighting and telephone.

The acceptance and handover of duty must be documented by the senior operator with an entry in the shift log indicating the results of checking the boilers and related equipment (pressure gauges, safety valves, nutritional devices, automation equipment and gas equipment).

1.5. It is not allowed to accept and hand over the shift during the liquidation of the accident.

1.6. Unauthorized persons access to the boiler room is allowed by the head of the enterprise.

1.7. The boiler room, boilers and all equipment, passages must be kept in good condition and proper cleanliness.

1.8. Doors for exiting the boiler room should open easily to the outside.

1.9. Boiler elements may only be repaired if there is no pressure at all. Before opening hatches and hatches located within the water space, the water from the boiler elements must be drained.

1.10. It is allowed to carry out work inside the furnaces and flues of the boiler only at a temperature not exceeding 50°C with the written permission of the person responsible for the good condition and safe operation of the boilers.

1.11. Before starting repair work, the furnace and gas ducts must be well ventilated, lit and reliably protected from possible penetration of gases and dust from gas ducts of operating boilers.

1.12. Before closing hatches and manholes, it is necessary to check whether there are people or foreign objects inside the boiler.

1.13. Before starting work, the furnace or gas ducts must be well ventilated, lit and reliably protected from possible penetration of gases and dust from the gas ducts of operating boilers.

1.14. Before allowing people for repair work, the boiler must be turned off along all lines through which it can be put under pressure (the main steam line and its drains, feed lines, fuel oil or gas pipeline, periodic purge line).

1.15. A work permit was issued in two copies indicating the following security measures:

  • plugs installed;
  • the fan electric motor is de-energized and the poster "Do not turn it on - people are working!" is posted on the starter;
  • lighting 12V;
  • work in overalls, safety shoes.

2. Preparing the boiler for kindling

2.1. Before firing up the boiler, check:

  • serviceability of the furnace and gas ducts, locking and control devices;
  • serviceability of instrumentation, fittings, feeding devices, smoke exhausters and fans;
  • serviceability of equipment for burning liquid fuels;
  • filling the boiler with water by starting the feed and circulation pumps;
  • lack of plugs on the fuel oil pipeline, nutrient materials, purge lines;
  • the absence of people and foreign objects in the furnace;
  • fill the boiler with water up to the ignition level mark.

2.2. Blow the gas pipeline through a purge candle, make sure that there are no gas leaks from gas pipelines, gas equipment and fittings by soaping.

2.3. Check on the pressure gauge that the pressure of the gas and air in front of the burners is consistent with the fan running.

2.4. Adjust the draft in the upper part of the furnace by setting the vacuum in the furnace to 2-3 mm of water column.

2.5. Ventilate the furnace and gas pipes for 10-15min by turning on the smoke exhauster and fan.

3. Kindling the boiler

3.1. The kindling of the boiler should be carried out only if there is a written order in the shift log of the person responsible for the gas economy or the person replacing him. The order must indicate the duration of the kindling, the time, who is to carry out the kindling.

3.2. The kindling of the boiler must be carried out within the time set by the head of the boiler room, with low fire, reduced draft.

When kindling the boiler, it is necessary to ensure uniform heating of its parts.

3.3. The burner of a gaseous boiler must be ignited in the following sequence:

  • light the igniter and bring it into the mouth of the nozzle to be turned on, supply liquid fuel by slowly opening the valve (valve) in front of the nozzle and making sure that it immediately lights up, adjust the air supply, vacuum in the upper part of the furnace. The flame must be stable, without pulsation. Remove igniter;
  • if the flame goes out, stop the gas supply by closing the valves in front of the nozzle, ventilate the firebox and start kindling according to the instructions.

When lighting the burner, you should not stand against the peep hole, so as not to get burned from a flame accidentally thrown out of the firebox. The operator must be provided with safety glasses.

3.4. It is forbidden:

  • ignite extinguished gas in the furnace without preliminary ventilation of the furnace and gas ducts;
  • light a torch from a nearby burner.

3.5. When kindling, it is necessary to control the movement of the boiler elements during thermal expansion.

3.6. Monitor the water level in the upper drum of the boiler and the steam pressure on the manometer.

3.7. When steam begins to come out of the open air vent, it must be closed.

3.8. Tightening of bolts, hatches during the firing up of the boiler must be carried out with care, with wrenches without the use of extension levers in the presence of the person responsible for the operation of the boilers. This operation must be carried out at a pressure not exceeding 3 kg/cm2.

4. Putting the boiler into operation (main steam line)

4.1. Before putting the boiler into operation, the following operations must be carried out:

  • check the serviceability of the pressure gauge, safety valve (by forced opening), water-indicating instruments (by purging them), with an entry in the logbook;
  • check and put into operation safety automatics, regulation automatics;
  • purge the lower points of the boiler.

4.2. The inclusion of the boiler in the steam pipeline should be done slowly, after thorough heating and purging of the steam pipeline. When warming up, it is necessary to monitor the serviceability of the steam pipeline, its compensators, supports and hangers. If water hammer occurs, stop heating and find out the cause.

4.3. Switching on is carried out at a pressure equal to the main steam line or lower by 0,5 atm.

4.4. The time of the start of kindling and turning on the boiler is recorded in the logbook.

5. Operation of the boiler

5.1. During duty, the personnel of the boiler room must monitor the health of the boiler (boilers) and all equipment of the boiler room, strictly observe the established mode of operation of the boiler. Faults detected during the operation of the equipment should be recorded in a shift log. Personnel must take corrective action. If it is impossible to eliminate the malfunctions on your own, then you must inform the head of the boiler house or the person responsible for the gas management of the boiler house.

5.2. Particular attention must be paid to:

To maintain a normal water level in the boiler and uniform supply of water to it. In this case, the water level must not be allowed to fall below the established value, and replenishment is strictly prohibited.

  • to maintain a normal water level in the boiler and uniform supply of water to it. At the same time, the water level must not be allowed to fall below the set value, while replenishment is strictly prohibited;
  • to maintain normal steam pressure according to the manometer (6-8 kg / cm2);
  • for the operation of gas burners, maintaining normal parameters of gas and air, according to the regime map;
  • maintain fuel oil temperature within 80-100°C.

5.3. Checking the health of the pressure gauge using three-way valves, checking the health of the safety valve by forced opening, purging the low points should be carried out by the operator every shift with an entry in the logbook.

5.4. When working on gas fuel, to increase the load, you should constantly add first the gas supply, then air and adjust the draft.

To reduce - first reduce the air supply, then gas, and then adjust the vacuum.

5.5. If all or some of the burners go out during boiler operation, the gas supply to the burners should be immediately cut off, the furnace and burners ventilated, and the blow-off candle opened. Find out and eliminate the cause of the violation of the combustion regime and proceed with kindling according to the established scheme.

5.6. During the operation of the boiler, it is forbidden to caulk the seams, weld the elements of the boiler.

5.7. All devices and devices for automatic control and safety of the boiler must be maintained in good condition and regularly checked, within the prescribed time limits, by the administration.

6. Emergency stop of the boiler

6.1. If a failure of one of the safety valves is detected.

6.2. If the steam pressure has increased by 10%, exceeding the permitted pressure, and does not decrease despite the measures taken (increased supply of water to the boiler, load reduction).

6.3. When the water level drops below the permissible mark. Make-up is strictly prohibited, which can lead to an explosion of the boiler.

6.4. When the level rises above the set mark.

6.5. In case of failure of all water-indicating devices.

6.6. When they fail all feed pumps.

6.7. Upon detection of the main elements of the boiler (drums, collectors, screen and boiler pipes), breaks, cracks, bulges.

6.8. With a decrease in vacuum less than 0,5 mm of water. Art.

6.9. When the torch of one of the burners goes out.

6.10. When the water flow through the boiler is below the set value.

6.11. When the temperature of the water behind the boiler rises above the set value.

6.12. When increasing and decreasing the pressure of gas and air in front of the burners.

6.13. When the power supply is interrupted.

6.14. In the event of a fire that threatens the operating personnel and the boiler.

In case of emergency shutdown of the boiler, it is necessary:

Stop the supply of gas and air, open the purge plug (close the valves on the burners and the valves on the gas pipeline).

Monitor the water level in the boiler, close the main steam valve.

Make an entry in the watch log about the reasons and time of the boiler shutdown, notify the head of the boiler room about the emergency shutdown of the boiler.

In the event of a fire in the boiler room, the personnel must call the fire brigade and take all measures to extinguish it without stopping monitoring the boilers.

7. Boiler stop

7.1. It is produced only on the written order of the boiler house responsible for the gas economy.

7.2. Gradually reducing the supply of air and gas, close the valve on the burner, open the purge candle and close the valve on the gas pipeline.

7.3. Close the main steam valve and open the drain.

7.4. Ventilate the furnace and gas pipelines.

7.5. Close the valve at the water inlet and outlet of the boiler.

7.6. If there is no other boiler in operation, stop the circulation pump.

7.7. Make an entry in the shift log when the boiler stops.

 We recommend interesting articles Section Standard instructions for labor protection:

▪ Roofer. Standard instruction on labor protection

▪ Vehicle repair master. Standard instruction on labor protection

▪ Work on a manual gilding press. Standard instruction on labor protection

See other articles Section Standard instructions for labor protection.

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Artificial leather for touch emulation 15.04.2024

In a modern technology world where distance is becoming increasingly commonplace, maintaining connection and a sense of closeness is important. Recent developments in artificial skin by German scientists from Saarland University represent a new era in virtual interactions. German researchers from Saarland University have developed ultra-thin films that can transmit the sensation of touch over a distance. This cutting-edge technology provides new opportunities for virtual communication, especially for those who find themselves far from their loved ones. The ultra-thin films developed by the researchers, just 50 micrometers thick, can be integrated into textiles and worn like a second skin. These films act as sensors that recognize tactile signals from mom or dad, and as actuators that transmit these movements to the baby. Parents' touch to the fabric activates sensors that react to pressure and deform the ultra-thin film. This ... >>

Petgugu Global cat litter 15.04.2024

Taking care of pets can often be a challenge, especially when it comes to keeping your home clean. A new interesting solution from the Petgugu Global startup has been presented, which will make life easier for cat owners and help them keep their home perfectly clean and tidy. Startup Petgugu Global has unveiled a unique cat toilet that can automatically flush feces, keeping your home clean and fresh. This innovative device is equipped with various smart sensors that monitor your pet's toilet activity and activate to automatically clean after use. The device connects to the sewer system and ensures efficient waste removal without the need for intervention from the owner. Additionally, the toilet has a large flushable storage capacity, making it ideal for multi-cat households. The Petgugu cat litter bowl is designed for use with water-soluble litters and offers a range of additional ... >>

The attractiveness of caring men 14.04.2024

The stereotype that women prefer "bad boys" has long been widespread. However, recent research conducted by British scientists from Monash University offers a new perspective on this issue. They looked at how women responded to men's emotional responsibility and willingness to help others. The study's findings could change our understanding of what makes men attractive to women. A study conducted by scientists from Monash University leads to new findings about men's attractiveness to women. In the experiment, women were shown photographs of men with brief stories about their behavior in various situations, including their reaction to an encounter with a homeless person. Some of the men ignored the homeless man, while others helped him, such as buying him food. A study found that men who showed empathy and kindness were more attractive to women compared to men who showed empathy and kindness. ... >>

Random news from the Archive

Winkel Board Developer Board 14.12.2016

Mintbox Technologies has launched a fundraising campaign for the release of the Winkel Board, designed for development and prototyping. The upcoming novelty features a high degree of integration and support for the main wireless interfaces that may be required in such projects.

The Winkel Board is based on an Atmel Atmega128 microcontroller with 128 KB flash and 4 KB SRAM. The controller is compatible with the Arduino IDE development environment, but unlike the boards of the same name, the new product already has an Espressif ESP8266 wireless module with Wi-Fi 802.11 b/g/n support and an Itead HC-05 module that supports Bluetooth 2.0 with EDR. Atmel and Espressif controllers are connected by UART bus and can execute code independently from each other. There is a Nordic nRF24L01 radio transceiver operating in the ISM band, as well as a DS3231 real time clock. MPU-6050 accelerometer and gyroscope daughterboard can be connected.

The Winkel Board has a total of 38 digital and 8 analog input/output connectors; a microUSB port is wired for power and programming. The minimum fee for owning a board with two microcontrollers is $21, the Atmega128 version is priced at $12.

Other interesting news:

▪ Water is as valuable as oil or gas

▪ Robot Nurse

▪ Electricity from the snow

▪ Serotonin does not affect the development of depression

▪ Autumn children live longer

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ section of the site The most important scientific discoveries. Article selection

▪ article Digital satellite television. History of invention and production

▪ article Which building in New York cost the Americans one and a half times more due to corruption than the purchase of Alaska? Detailed answer

▪ article Cleaning fuel tanks. Standard instruction on labor protection

▪ article Model aircraft tachometer. Encyclopedia of radio electronics and electrical engineering

▪ article RF generator with a stable output voltage. Encyclopedia of radio electronics and electrical engineering

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024