Menu English Ukrainian russian Home

Free technical library for hobbyists and professionals Free technical library


ENCYCLOPEDIA OF RADIO ELECTRONICS AND ELECTRICAL ENGINEERING
Free library / Encyclopedia of radio electronics and electrical engineering / Electrician

Section 1. Organization of operation of electrical installations

Chapter 1.6. Maintenance, repair, modernization and reconstruction

Free technical library

Encyclopedia of radio electronics and electrical engineering / Rules for the technical operation of consumer electrical installations (PTE)

Comments on the article Comments on the article

1.6.1. Consumers must ensure maintenance, scheduled preventive maintenance, modernization and reconstruction of electrical installation equipment. Responsibility for their implementation rests with the leader.

1.6.2. The scope of maintenance and scheduled preventive repairs should be determined by the need to maintain the operability of electrical installations, periodically restore them and bring them into line with changing operating conditions.

1.6.3. For all types of repairs of the main equipment of electrical installations, annual plans (schedules) approved by the technical manager of the Consumer must be drawn up by the person responsible for electrical facilities.

Repair of electrical equipment and apparatus directly related to technological units must be carried out simultaneously with the repair of the latter.

1.6.4. Repair schedules for electrical installations that affect changes in production volumes must be approved by the head of the organization. Consumers should also develop long-term plans for the technical re-equipment and reconstruction of electrical installations.

1.6.5. The frequency and duration of all types of repairs, as well as the duration of the annual downtime in repairs for certain types of electrical equipment, are established in accordance with these Rules, current industry standards and instructions from manufacturers.

1.6.6. Maintenance and repair can also be carried out based on the results of technical diagnostics when the Consumer has a technical diagnostics system - a combination of the object of diagnostics, the diagnostic process and performers prepared for diagnostics and performing it according to the rules established by the relevant documentation.

Such documentation includes: industry standard (hereinafter referred to as OST), departmental guidance document (hereinafter referred to as VRD), regulations, enterprise standard (hereinafter referred to as STP) and other documents adopted in this industry or at this Consumer.

This document, drawn up in accordance with the current rules of state supervision bodies and state standards, describes the entire procedure for conducting technical diagnostics and delivering technical diagnostics. The document is drawn up separately for the types of electrical installations. For electrical equipment, the recommended approximate procedure for technical diagnostics of electrical installations of Consumers is presented in Appendix 2.

1.6.7. After the expiration of the service life established by the regulatory and technical documentation, all technological systems and electrical equipment must be subject to technical examination by a commission headed by the technical manager of the Consumer in order to assess the condition, establish terms for further work and operating conditions.

The results of the work of the commission should be reflected in the act and technical passports of technological systems and electrical equipment with the obligatory indication of the period for the subsequent examination.

Technical certification can also be carried out by specialized organizations.

1.6.8. Structural changes in electrical equipment and apparatus, as well as changes in electrical circuits during repairs are carried out in accordance with the approved technical documentation.

1.6.9. Prior to the withdrawal of the main equipment of electrical installations for major repairs, there must be:

type="disc">
  • statements of the scope of work and estimates were drawn up, specified after opening and inspecting the equipment, as well as a schedule of repair work;
  • the necessary materials and spare parts have been procured according to the scope of work sheets;
  • drafted and approved technical documentation for work during the overhaul period;
  • tools, fixtures, rigging equipment and hoisting and transport mechanisms are completed and brought into good condition;
  • workplaces for repairs were prepared, the layout of the site was made, indicating the placement of parts and details;
  • repair crews are staffed and instructed.
  • 1.6.10. The equipment installed by the Customer must be provided with spare parts and materials. The condition of spare parts, materials, conditions of delivery, storage should be periodically checked by those responsible for electrical facilities.

    1.6.11. The equipment introduced after repair must be tested in accordance with the standards for testing electrical equipment (Appendix 3).

    1.6.12. Special tests of the operated equipment are carried out according to the schemes and programs approved by those responsible for electrical facilities.

    1.6.13. The main equipment of electrical installations that has undergone a major overhaul is subject to load testing for at least 24 hours, unless there are other instructions from the manufacturers. If defects are found that prevent the normal operation of the equipment, the repair is considered incomplete until these defects are eliminated and the test is repeated.

    1.6.14. All work performed during the overhaul of the main electrical equipment is accepted according to the act, to which the technical documentation for the repair must be attached. Acts with all applications are stored in equipment passports. About the work carried out during the repair of the rest of the electrical equipment and apparatus, a detailed entry is made in the equipment passport or in a special repair journal.

    1.6.15. For the timely and high-quality performance of the tasks specified in this chapter, the repair personnel must have warehouses, workshops and other relevant premises, as well as devices, test and measurement tools, incl. for early diagnosis of defects, for example, vibroacoustic devices, televisions, stationary and mobile laboratories, etc.

    See other articles Section Rules for the technical operation of consumer electrical installations (PTE).

    Read and write useful comments on this article.

    << Back

    Latest news of science and technology, new electronics:

    A New Way to Control and Manipulate Optical Signals 05.05.2024

    The modern world of science and technology is developing rapidly, and every day new methods and technologies appear that open up new prospects for us in various fields. One such innovation is the development by German scientists of a new way to control optical signals, which could lead to significant progress in the field of photonics. Recent research has allowed German scientists to create a tunable waveplate inside a fused silica waveguide. This method, based on the use of a liquid crystal layer, allows one to effectively change the polarization of light passing through a waveguide. This technological breakthrough opens up new prospects for the development of compact and efficient photonic devices capable of processing large volumes of data. The electro-optical control of polarization provided by the new method could provide the basis for a new class of integrated photonic devices. This opens up great opportunities for ... >>

    Primium Seneca keyboard 05.05.2024

    Keyboards are an integral part of our daily computer work. However, one of the main problems that users face is noise, especially in the case of premium models. But with the new Seneca keyboard from Norbauer & Co, that may change. Seneca is not just a keyboard, it is the result of five years of development work to create the ideal device. Every aspect of this keyboard, from acoustic properties to mechanical characteristics, has been carefully considered and balanced. One of the key features of Seneca is its silent stabilizers, which solve the noise problem common to many keyboards. In addition, the keyboard supports various key widths, making it convenient for any user. Although Seneca is not yet available for purchase, it is scheduled for release in late summer. Norbauer & Co's Seneca represents new standards in keyboard design. Her ... >>

    The world's tallest astronomical observatory opened 04.05.2024

    Exploring space and its mysteries is a task that attracts the attention of astronomers from all over the world. In the fresh air of the high mountains, far from city light pollution, the stars and planets reveal their secrets with greater clarity. A new page is opening in the history of astronomy with the opening of the world's highest astronomical observatory - the Atacama Observatory of the University of Tokyo. The Atacama Observatory, located at an altitude of 5640 meters above sea level, opens up new opportunities for astronomers in the study of space. This site has become the highest location for a ground-based telescope, providing researchers with a unique tool for studying infrared waves in the Universe. Although the high altitude location provides clearer skies and less interference from the atmosphere, building an observatory on a high mountain poses enormous difficulties and challenges. However, despite the difficulties, the new observatory opens up broad research prospects for astronomers. ... >>

    Random news from the Archive

    Microcontrollers STM32 Value Line 31.05.2010

    STMicroelectronics, one of the leading manufacturers of microcontrollers in the world, announced the start of production of a new 32-bit low-cost microcontroller that takes advantage of the industrial STM32 core and is designed for low-cost applications.

    Microcontrollers of the STM32F100 ("Value line") family are intended for applications where the power of a 16-bit microcontroller is already insufficient, and the rich set of functionality of conventional 32-bit microcontrollers is redundant. The STM32F100 microcontroller line is based on a modern 24 MHz ARM Cortex-M3 core with peripherals optimized for use in typical applications where 16-bit microcontrollers were used.

    The performance of this line at 24 MHz, coupled with zero latency access to the built-in flash memory, is 30 DMIPS, which is superior to most 16-bit microcontrollers. The line includes the following peripherals - up to 12 16-bit timers with advanced functions, high-speed 12-bit ADCs and DACs, CEC (Consumer Electronics Control) protocol included in the HDMI standard.

    STM32F100 is not only a cheap and optimized Cortex-M3 microcontroller, but also access to a rich development environment for STM32 family microcontrollers, which includes free libraries for all peripherals, motor control and touch keyboards.

    Other interesting news:

    ▪ Nanoparticles in silk

    ▪ Sony Triporous Fiber sock material

    ▪ Early retirement negatively affects the brain

    ▪ Glaciers are melting on Everest

    ▪ acoustic levitator

    News feed of science and technology, new electronics

     

    Interesting materials of the Free Technical Library:

    ▪ site section Regulators of current, voltage, power. Article selection

    ▪ article Smoking incense. Popular expression

    ▪ article What is chlorine? Detailed answer

    ▪ article Measuring distances on the map. Travel Tips

    ▪ article Tuning antennas with a frequency response meter. Encyclopedia of radio electronics and electrical engineering

    ▪ article Utilization and heat recovery. Encyclopedia of radio electronics and electrical engineering

    Leave your comment on this article:

    Name:


    Email (optional):


    A comment:





    All languages ​​of this page

    Home page | Library | Articles | Website map | Site Reviews

    www.diagram.com.ua

    www.diagram.com.ua
    2000-2024