Safe Operation

1. General requirements for labor protection

1.1. Persons at least 18 years of age who have been trained, instructed in labor protection and have passed the knowledge test of the Rules for the Safe Operation of Consumer Electrical Installations are allowed to carry out repair work on cable power lines and install connecting and terminating cable couplings.

1.2. The work is documented by an order - a permit that determines the safe production of work, determines its content, place, start and end time of work, necessary safety measures, the composition of the team and persons responsible for the safe performance of work.

2. Safety requirements before starting work

2.1. Before performing work, employees are required to use special footwear and overalls issued to them.

2.2. Fasten the sleeves of the clothes at the wrist over the canvas mittens.

2.3. Prepare and check safety goggles, mounting materials and tools.

2.4. Works are carried out in a headdress, it is necessary to ensure that strands of hair do not fall out from under the headdress.

3. Safety requirements during work

3.1. Earthworks are carried out using mechanisms, if it is impossible to use them. manual development is allowed. In the area of ​​underground utilities (electric cables, gas and water pipes, etc.), earthworks are allowed only with the written permission of the organization responsible for their operation. Soil development in the immediate vicinity of existing underground utilities is allowed only with the help of shovels, without sharp blows, it is prohibited to use impact tools (crowbars, picks, wedges, pneumatic tools, etc.).

3.2. If underground structures are found that are not indicated in the drawings, earthworks should be immediately stopped until the nature of the discovered structures is clarified and an appropriate permit for further work is obtained.

3.3. For the passage of workers into the pits and trenches, ladders or ladders should be installed.

3.4. The vertical walls of pits and trenches, if necessary, must be reinforced with ladder-type fasteners or wooden shields.

3.5. The place of work is fenced with the installation of warning inscriptions and signs, and signal lighting is installed at night.

3.5. Before opening the sleeves or cutting the cable, you must make sure that these operations will be performed on the cable on which you need.

3.6. The cable to be repaired should be determined by the joints of the building by tracing, checking the folds according to the diagrams and drawings when laying in the ground.

3.7. Before cutting the cable or opening the coupling, it is necessary to check the absence of voltage using a special tool. The puncture of the cable is carried out by the head of work or allowing under his supervision. The cable should be pierced with dielectric gloves using goggles.

3.8. The cable mass for pouring the couplings is heated in a special metal container from the roofs; oh and a nose. Heating unopened cans of cable mass is prohibited.

3.9. When pouring cable mass, canvas gloves and goggles should be worn. It is forbidden to transfer the vessel with the mass from hand to hand; when transferring, it must be placed on the ground or on a solid foundation.

3.10. While soldering the cable cores, it is necessary to hold the clip-forms with pliers, remove carbon deposits from the surface of the molten solder with a spoon, which is heated before use. The mother of the clip-form is necessary only after the end of soldering and cooling them. When soldering, care must be taken not to burn the cable cover. To avoid overheating of the paper insulation, soldering must be done as quickly as possible (3-4 minutes). The outer jute covers must be carefully removed from the cables.

3.11. At night, the workplace should be lit.

4. Safety requirements after completion of work

4.1. After the completion of hot work, it is necessary to carefully inspect the workplace, pour water on burning materials and eliminate violations that could lead to a fire.

4.2. Tidy up the workplace, remove the tool, blowtorch, cleaning material.

4.3. Backfill an open pit or trench.

4.4. Bring the land occupied for installation and repair work to its previous state.

5. Safety requirements in case of emergencies

5.1. During earthworks, if explosive materials and ammunition are found, work is immediately stopped, work can be resumed only after they have been removed by sappers.

5.2. If malfunctions are detected in the form of leakage of the blowtorch reservoir, its deformation, etc. work must be stopped immediately and the lamp handed over for repair.

5.3. In case of ignition of the cable mass, to extinguish the fire, use an asbestos blanket made of non-combustible heat-insulating fabric, coarse woolen fabric or felt.

5.4. It is allowed to resume hot work only after all fire safety requirements have been met (availability of fire extinguishing equipment, cleaning the workplace from combustible materials, protection of combustible cable structures, etc.).

5.5. When a cable catches fire, the flame must be extinguished with sand or earth, taking measures against the spread of fire along its length.

See other articles Section Occupational Safety and Health

 We recommend interesting articles Section Standard instructions for labor protection:

▪ Electrician for the repair and installation of electrical equipment. Standard instruction on labor protection

▪ Carrying out silvicultural works on slopes. Standard instruction on labor protection

▪ Shop loader. Standard instruction on labor protection

See other articles Section Standard instructions for labor protection.

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Artificial leather for touch emulation 15.04.2024

In a modern technology world where distance is becoming increasingly commonplace, maintaining connection and a sense of closeness is important. Recent developments in artificial skin by German scientists from Saarland University represent a new era in virtual interactions. German researchers from Saarland University have developed ultra-thin films that can transmit the sensation of touch over a distance. This cutting-edge technology provides new opportunities for virtual communication, especially for those who find themselves far from their loved ones. The ultra-thin films developed by the researchers, just 50 micrometers thick, can be integrated into textiles and worn like a second skin. These films act as sensors that recognize tactile signals from mom or dad, and as actuators that transmit these movements to the baby. Parents' touch to the fabric activates sensors that react to pressure and deform the ultra-thin film. This ... >>

Petgugu Global cat litter 15.04.2024

Taking care of pets can often be a challenge, especially when it comes to keeping your home clean. A new interesting solution from the Petgugu Global startup has been presented, which will make life easier for cat owners and help them keep their home perfectly clean and tidy. Startup Petgugu Global has unveiled a unique cat toilet that can automatically flush feces, keeping your home clean and fresh. This innovative device is equipped with various smart sensors that monitor your pet's toilet activity and activate to automatically clean after use. The device connects to the sewer system and ensures efficient waste removal without the need for intervention from the owner. Additionally, the toilet has a large flushable storage capacity, making it ideal for multi-cat households. The Petgugu cat litter bowl is designed for use with water-soluble litters and offers a range of additional ... >>

The attractiveness of caring men 14.04.2024

The stereotype that women prefer "bad boys" has long been widespread. However, recent research conducted by British scientists from Monash University offers a new perspective on this issue. They looked at how women responded to men's emotional responsibility and willingness to help others. The study's findings could change our understanding of what makes men attractive to women. A study conducted by scientists from Monash University leads to new findings about men's attractiveness to women. In the experiment, women were shown photographs of men with brief stories about their behavior in various situations, including their reaction to an encounter with a homeless person. Some of the men ignored the homeless man, while others helped him, such as buying him food. A study found that men who showed empathy and kindness were more attractive to women compared to men who showed empathy and kindness. ... >>

Random news from the Archive

Chips P5CT072 for passports on plastic cards 26.04.2005

PHILIPS SEMICONDUCTOR Corporation has mastered the production of P5CT072 chips for passports on plastic cards. With a large amount of EEPRQM memory (72 Kbytes), the chip can store large amounts of various information (digital photographs, images of the iris, fingerprints).

The parameters of the microcircuit exceed the requirements of the Civil Aviation Organization (ICAQ). A high level of information security is also provided.

Other interesting news:

▪ Drone - helium balloon

▪ Nanotechnology on glass

▪ Remote control for PlayStation 3

▪ plastic from tomato skins

▪ Luminous target of the surgeon

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ website section LEDs. Article selection

▪ article by John Donne. Famous aphorisms

▪ article Why do we need eyebrows? Detailed answer

▪ Shenandoah article. Nature miracle

▪ article What to look for when listening. Encyclopedia of radio electronics and electrical engineering

▪ article Two AF power amplifiers. Encyclopedia of radio electronics and electrical engineering

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024