OCCUPATIONAL SAFETY AND HEALTH
Instruction on labor protection for an electrician on the repair and maintenance of electrical equipment of hoisting machines. Full document Occupational Safety and Health / Standard instructions for labor protection Safe Operation 1. General requirements for labor protection 1.1. To perform the work of an electrician for the repair and maintenance of electrical equipment of hoisting machines, persons are allowed at least 18 years of age who have passed a medical examination, trained according to the appropriate program and certified by the qualification commission, as well as received instructions on safe working methods directly at the workplace with registration in the Instruction Registration Log. 1.2. An electrician authorized to repair and maintain hoisting machines must have an electrical safety group of at least III. 1.3. A certified electrician is issued a certificate for the right to repair and maintain electrical equipment of hoisting machines signed by the chairman of the commission, sealed with a stamp. 1.4. The admission to the work of an electrician for the repair and maintenance of hoisting machines is issued by order of the enterprise (workshop, section) after the issuance of a certificate and instructions on labor protection. 1.5. Re-testing the knowledge of an electrician who repairs and maintains hoisting machines is carried out:
1.6. An electrician admitted to independent work on the repair and maintenance of electrical equipment of hoisting machines must know:
1.7. The electrician is obliged to comply with the internal labor regulations of the enterprise. Smoking in production and auxiliary premises and on the territory of the enterprise is allowed only in places specially designated for this purpose. 1.8. During work, the electrician may be exposed to the following hazardous and harmful production factors:
1.9. The electrician must be provided with personal protective equipment:
1.10. An electrician admitted to independent work on the repair and maintenance of electrical equipment of hoisting machines must:
1.11. An electrician for the repair and maintenance of lifting machines must know and observe the rules of personal hygiene. 1.12. An electrician for the repair and maintenance of hoisting machines must be able to provide the victim with first (pre-medical) aid in case of an accident. 1.13. If any questions arise during the work related to its safe performance, it is necessary to contact the person responsible for the safe performance of work. 1.14. A trained and certified electrician for the repair and maintenance of electrical equipment of lifting machines is fully responsible for violation of the requirements of this Instruction in accordance with applicable law. 2. Safety requirements before starting work 2.1. Before starting work, the electrician must familiarize himself with the entries in the operational log, accept from the electrician who handed over the shift the technical documentation approved by the power engineer, safety protective equipment, make an entry on the acceptance of the shift in the operational log and sign. 2.2. Make sure the work area is adequately lit. 2.3. Tidy up the workplace, remove all items that may interfere with safe work. 2.4. Put on the appropriate overalls, prepare serviceable and tested personal protective equipment (dielectric gloves, galoshes). 2.5. Notify the foreman or supervisor of all noticed shortcomings in the workplace and do not start work until their instructions. 3. Safety requirements before starting work During maintenance between overhauls 3.1. Work carried out to eliminate faults in the electrical equipment of hoisting machines at the request of machinists and non-electrical personnel, and inspections regarding the safety of their implementation are divided into:
In the order of current operation, the electrician on duty for servicing the electrical equipment of hoisting machines is allowed, in the presence of a driver (crane operator) who has an electrical safety group II, to perform the following work:
3.2. The electrician, having received an application from the driver (crane operator), must make an entry in the operational log, indicating the date and time of receipt of the application, the name and position of the person who submitted the application, the content of the application and the start time of work. After eliminating the detected faults in the same journal, it is necessary to make a record of the content of the work performed and the time of their completion. At the same time, a record is made of troubleshooting in the logbook of the driver (crane operator). 3.3. If faults are found that are not related to the list of works performed in the order of current operation, the electrician on duty must report to the shift supervisor about the deficiencies found. 3.4. Work performed by order, with an entry in the operational log:
3.5. The execution of work according to the order must be carried out by two persons with an electrical safety group of at least III, with complete removal of voltage, with the implementation of the necessary organizational and technical measures in accordance with the requirements of the "Safety Rules for the Operation of Consumer Electrical Installations" with an entry in the operational log. 3.6. The person giving the order must determine the composition of the team, the foreman and organize the admission of the team to work. 3.7. For all types of repairs and inspections of the electrical equipment of a crane located between two operating cranes, a work permit must be issued with entries in the watch logs of all cranes of this span. 3.8. Periodic inspection of the electrical equipment of hoisting machines is aimed at identifying and eliminating possible malfunctions in electrical equipment, safety devices and devices, in power circuits, control circuits, alarm circuits, checking the serviceability of safety protective equipment and fire extinguishing equipment and confirming in the journal of periodic inspections that the electrical equipment of hoisting machines is in good condition. 3.9. When inspecting the electrical equipment of cranes, the adjustment and switching on of the mechanisms must be carried out at the signal of the person performing the inspection. 3.10. When moving the crane bridge, persons inspecting and troubleshooting the crane's electrical equipment should be in the cab or on the bridge deck, while avoiding touching the protruding parts of the ceiling, columns, fittings. 3.11. When you reach the deck of the crane gallery, the switch in the driver's cab must be turned off and a poster is posted on its drive: "Do not turn it on! People are working." Remove the poster - only by order of operational personnel. 3.12. When inspecting and troubleshooting the electrical equipment of the crane, all precautions must be observed, the necessary serviceable and tested protective equipment must be used. 3.13. Upon completion of the repair and inspection, all removed guards on electrical equipment and on electrical appliances must be put in place and strengthened. 3.14. The results of the inspection for each crane separately must be recorded in the journal of periodic inspections indicating the date, time of the inspection, a summary of the identified and eliminated deficiencies, and there must be a signature of the person performing the repair. 3.15. When troubleshooting, adjusting and inspecting the electrical equipment of the crane, it is prohibited:
3.16. For portable power tools and portable lamps, use a safe voltage not higher than 36 V. 3.17. When performing all work, the electrician must withdraw the key-brand from the crane operator in the manner established at the enterprise for the use of the key-brand system. During scheduled repairs 3.18. The withdrawal of the crane for repair should be carried out by the person responsible for maintaining the lifting machines in good condition, in accordance with the scheduled repair schedule with the issuance of an order for work in electrical installations. The outfit is issued by persons of the electrical personnel of the site, authorized by the order of the chief power engineer of the enterprise. The lines of the order "Separate Instructions" fix additional safety measures related to working at height, to prevent running cranes from colliding with the one being repaired, access of repair personnel to the crane tracks of existing cranes, etc. The completed work order is handed over to the person responsible for maintaining the hoisting machines in good condition the day before the start of the repair, who authorizes work in the "Separate Instructions" lines of the work order with his signature and returns it to the person who issued the work order. The person responsible for maintaining the hoisting machines in good condition, before the start of the repair, is obliged to make the following entry in the watch log of the driver (crane operator) of the crane being repaired: "I authorize the work foreman comrade ______________ to repair the electrical equipment of the crane No. ___ by _______ type of repair from ___ h ____ min ____ day _____ month _______ year ____ to ____ h _____ min _____ day _____ month _____ year" and sign. 3.19. The order for work in electrical devices must indicate the composition of the team, the foreman who allows work, the person issuing the order; necessary technical measures to ensure the safety of work during the repair of electrical equipment of the crane; date and time of commencement of work, admission of the brigade and completion of work. 3.20. The admission of the brigade to the repair of the electrical equipment of the crane is made by the person of the operating personnel on the basis of an order for work in electrical installations and the permission of the person responsible for maintaining the lifting machines in good condition. The admitting person makes an entry in the operational log of the power engineering service with the design of the appropriate columns in the order and admits the brigade to the crane. 3.21. To ensure safety during the repair of the electrical equipment of the crane, it is necessary to put it on the repair site, make the necessary shutdowns, close the knife switch drive with a lock, hang safety warning posters, install portable grounding and make a fence under the repair site. 3.22. Repair of the electrical equipment of the crane can be carried out by electricians who have a certificate for the right to repair and maintain hoisting machines, at least two people with an electrical safety group of at least III. 3.23. Keep unauthorized persons away from the crane. It is forbidden to enter the crane tracks without obtaining a special permit. 3.24. Upon completion of the repair and closing of the order, the person responsible for maintaining the hoisting machines in good condition checks the readiness of the crane for operation, makes an entry in the crane logbook: "I allow the crane to operate from ___ h ____ min ____ day ____ month ____ year" with his signature . 4. Safety requirements in emergency situations 4.1. In the event of an accident, the victim or an eyewitness who was at the same time is obliged to immediately notify the foreman or head of the site, who must organize the provision of first (pre-medical) aid to the victim and send him to a medical institution. In case of a severe accident, immediately call an ambulance and notify the administration. 4.2. Troubleshooting of electrical equipment of hoisting machines should be carried out only when the crane is disconnected from the mains. 5. Safety requirements at the end of work 5.1. At the end of a shift or work, the electrician must:
See other articles Section Occupational Safety and Health We recommend interesting articles Section Standard instructions for labor protection: ▪ Operation of an electric single-girder overhead crane. Standard instruction on labor protection ▪ Pruning with petrol-powered saws with low handles. Standard instruction on labor protection ▪ Work on insert-sewing-cutting machines. Standard instruction on labor protection See other articles Section Standard instructions for labor protection. Read and write useful comments on this article. Latest news of science and technology, new electronics: Artificial leather for touch emulation
15.04.2024 Petgugu Global cat litter
15.04.2024 The attractiveness of caring men
14.04.2024
Other interesting news: ▪ Netgear Nighthawk M1 Mobile Router ▪ Global warming will open up the North Pole for navigation ▪ Wall mounted smart battery for home News feed of science and technology, new electronics
Interesting materials of the Free Technical Library: ▪ section of the site Big encyclopedia for children and adults. Selection of articles ▪ article Don't think down the seconds. Popular expression ▪ article Over what three seas did the Tver merchant Afanasy Nikitin travel? Detailed answer ▪ article The main directions in the work on labor protection
Leave your comment on this article: Comments on the article: a guest You are great [up] All languages of this page Home page | Library | Articles | Website map | Site Reviews www.diagram.com.ua |