Instructions on labor protection for the driver of a mobile power plant. Full Document Occupational Safety and Health / Standard instructions for labor protection 1. General provisions 1.1. Persons who have reached the age of 18, have a certificate for the right to operate a mobile power plant and are recognized by the medical commission as fit for this work are allowed to work as a driver of a mobile power plant. The driver must have an electrical safety group of at least IV. 1.2. The power plant driver hired must undergo an introductory briefing on labor protection, industrial sanitation, fire safety, methods and methods of providing first aid to victims and must be familiarized with the working conditions, rights and benefits for working in harmful and dangerous working conditions, against signature, about the rules of conduct in case of accidents. Before starting work directly at the workplace, the power plant operator must undergo an initial briefing on safe work practices. On the conduct of introductory briefing and briefing at the workplace, appropriate entries are made in the Logbook for the registration of introductory briefings on labor protection issues and the Logbook for the registration of briefings on labor protection issues. At the same time, the signatures of both the one who was instructed and the one who instructed are required. 1.3. After the initial briefing at the workplace, the power plant operator must undergo an internship for 2-15 shifts, depending on the length of service, experience and nature of work, under the guidance of an experienced qualified power plant operator, who is appointed by order (instruction) for the enterprise. 1.4. Repeated briefing on the rules and methods of safe work and labor protection, the power plant operator must undergo:
1.5. During operation, the power plant operator must comply with the requirements of the operating instructions for the mobile power plant. It is not allowed to operate a faulty power plant. 1.6. It is forbidden to install a mobile power plant in conditions of increased danger (in the security zones of overhead power lines, on the territory of an operating enterprise, if an industrial hazard may arise, etc.). 1.7. It is necessary to work at the power plant in overalls and safety shoes provided for by the Model Industry Standards: cotton overalls, dielectric galoshes, rubber gloves, and in winter additionally - a cotton jacket with an insulated lining, cotton trousers with an insulated lining and felt boots. Overalls and safety shoes must be in good working order and correspond to the height and size of the driver. It is forbidden to work in clothes impregnated with fuels and lubricants. 1.8. The power plant must be installed on a dry and level site, cleared of debris and combustible materials. It is not allowed to install the power plant on swampy ground or in places where rainwater is concentrated. 1.9. It is forbidden to install mobile power plants in the area of the tower crane. 1.10. When installing a mobile power plant indoors, the driver must comply with the following conditions:
1.11. At the intersection of roads on the construction site, the electric cable must be laid in the ground (trenches), blocks, channels, along the walls of buildings in order to avoid damage. 1.12. External wiring of temporary power supply must be made with an insulated wire, placed on resistances at a height above ground level of at least:
1.13. When supplying stationary electrical receivers from a mobile power plant, the security measures must comply with the security measures carried out in the networks of stationary electrical receivers. 1.14. When powering electrical receivers of mobile installations from a mobile power station with a dead-earthed neutral, the following safety measures should be taken: zeroing, zeroing together with re-grounding, protective shutdown or zeroing together with protective shutdown. 1.15. When powering the electrical receivers of mobile units from a mobile power plant with an isolated neutral, as a safety measure, it is necessary to carry out protective grounding together with the metal connection of the unit's housings and power sources or with a protective shutdown. 1.16. It is recommended to use as natural grounding conductors:
1.17. For artificial grounding, steel should be used; artificial grounding conductors should not be painted. 1.18. When powering the electrical receivers of mobile installations from mobile autonomous sources with an isolated neutral, as a safety measure, protective grounding should be performed together with a metal connection between the installation housings and the power source or with a protective shutdown. In this case, the resistance of the grounding device should not exceed 10 ohms. 1.19. Autonomous mobile sources with an isolated neutral must have a device for constant monitoring of the insulation resistance relative to the body of the power source (ground). It shall be possible to check the integrity of the insulation monitoring device and to switch it off. 1.20. On the switchboard there should be an inscription: “Caution! Electric voltage!”, as well as the indicated voltage and the name of all feeders. 1.21. When performing repair work on the lines on the control panel, it is necessary to hang a poster on the handles of the disconnecting devices with the inscription: “Do not turn on - work on the line”, and also make an appropriate entry in the operational log. 1.22. When working at night, the power plant must be well lit (not less than 50 lux). When inspecting the power plant, it is allowed to use a portable electric lamp with a voltage of 36-42 V. 1.23. It is forbidden to work the driver in a state of intoxication, as well as the admission of unauthorized persons to the workplace of the power plant driver. 1.24. At a mobile power plant, it is necessary to have carbon dioxide and powder fire extinguishers. 1.25. It is forbidden to warm up the engine with an open flame. 1.26. Cleaning cloths impregnated with combustible and lubricating oil should be stored in a metal box with a lid. 1.27. It is forbidden to smoke near the power plant. 2. Safety requirements before starting work 2.1. Taking duty, the driver must review the operational log, take into account all comments about the malfunctions identified at the installation, and take measures to eliminate them. In the event of serious malfunctions, the driver must report this to the responsible engineering and technical worker. 2.2. Before starting the installation, the operator must:
2.3. It is necessary to fill the unit with fuel, lubricating oil and water when the engine is completely stopped. 2.4. If, during refueling, drops of fuel, oil or water have fallen on some parts of the unit, it is necessary to wipe all places dry after refueling. Leakage of fuel and oil is not allowed. 2.5. Equipment of a mobile power plant, cables, couplings must be protected from moisture and prevent snow, water, dust from getting on the electrical fittings. 2.6. Put on protective covers, caps and fasten tightly. 2.7. Before starting the power plant, the driver must check the alignment of the engine and generator in accordance with the operating instructions for the station. 3. Safety requirements during work 3.1. Unauthorized persons are not allowed to start the engine. 3.2. It is necessary to start the engine at a late ignition, while you should beware of a kickback with the crank. 3.3. Operation of the engine with a faulty pressure gauge is prohibited. 3.4. During the operation of a mobile power plant, the driver must observe:
3.5. The driver must monitor the connection of the fuel line and prevent fuel from escaping. 3.6. The temperature of the generator and gearbox bearings must not exceed 80°C. 3.7. When the generator is running, sparking of the brushes must not be allowed. The voltage on the generator must not be lower than the rated voltage. 3.8. During the operation of a mobile power plant, it is prohibited:
3.9. Fusible warning links may only be replaced when the main switch on the switchboard is turned off, using dielectric protective equipment. 3.10. Operation of the engine without water or with insufficient water is prohibited. 3.11. Do not add cold water to the radiator of an overheated engine, or leave the engine filled with water for a long time at temperatures below 0°C. 4. Safety requirements after finishing work 4.1. At the end of the work, the driver of the mobile power plant must:
4.2. About all malfunctions noticed during the operation of the power plant, make an entry in the shift acceptance and delivery log and report to the foreman. 4.3. After finishing work, the driver must remove overalls, safety shoes, clean them from dust and other dirt and put them in the place provided for storage. Then wash your face and hands with warm water and soap or take a shower. 5. Safety requirements in emergency situations 5.1. If, when starting the engine, the driver detects a knock or noise, he must immediately stop the engine to find out the causes and eliminate the defect. 5.2. If during the first minute of engine operation the pressure gauge does not show a lubricating oil pressure of 2-3 atm, the driver must:
5.3. If you detect a smell of burning or smoke, you must stop working. 5.4. Do not extinguish burning wires or electric cables without turning off the voltage. 5.5. In the event of a fuel fire, it is necessary to shut off the fuel supply to the engine, and then take measures to extinguish it. It is forbidden to extinguish burning fuels and lubricants with water. For this purpose it is necessary to use powder fire extinguishers, sand, earth or tarpaulin. 5.6. In case of accidents, the driver must provide the victim with first aid, if necessary, call for emergency medical assistance, and immediately inform the administration about the accident. We recommend interesting articles Section Standard instructions for labor protection: ▪ Working with antifreeze Standard instruction on labor protection ▪ Boiler operator, stoker. Standard instruction on labor protection See other articles Section Standard instructions for labor protection. Read and write useful comments on this article. Latest news of science and technology, new electronics: Artificial leather for touch emulation
15.04.2024 Petgugu Global cat litter
15.04.2024 The attractiveness of caring men
14.04.2024
Other interesting news: ▪ Pedestrian crossing lights up ▪ LG's first wall-mounted projector ▪ Transparent OLED TV Mi TV Lux Transparent Edition News feed of science and technology, new electronics
Interesting materials of the Free Technical Library: ▪ website section Television. Article selection ▪ article Fundamentals of Immunology. History and essence of scientific discovery ▪ article What do ethics and aesthetics study? Detailed answer ▪ article Rights, obligations and liability of subjects of insurance ▪ article solar power generator. Encyclopedia of radio electronics and electrical engineering ▪ article Quartz oscillators. Encyclopedia of radio electronics and electrical engineering
Leave your comment on this article: All languages of this page Home page | Library | Articles | Website map | Site Reviews www.diagram.com.ua |