Instructions on labor protection when testing the insulation of cores of communication cables

Occupational Safety and Health

Occupational Safety and Health / Standard instructions for labor protection

Comments on the article Comments on the article

Safe Operation

1. General requirements for labor protection

1.1. Persons at least 18 years old who have passed a medical examination, special training, practical training, who have an electrical safety group, who have the appropriate qualifications in accordance with the tariff and qualification directory, are allowed to test the insulation of the cores of communication cables. Periodic medical examinations of an electrical equipment repairman must take place once every 1 months.

1.2. Electricians who have been instructed in safety precautions and have learned safe working methods are allowed to work independently when testing the insulation of the cores of communication cables.

Personnel when performing work independently on electrical installations with voltage up to 1000 V must have at least safety group III, and more than 1000 V - group IV.

1.3. In the course of work, within the time limits set at the enterprise, the electrician must undergo safety briefing, coursework for an 18-hour program and pass exams on knowledge of the rules for the technical operation of consumer electrical installations and safety regulations for the operation of consumer electrical installations.

1.4. When testing the insulation of the conductors of communication cables, electricians must know the terms for testing protective equipment and devices, the rules for operating and caring for them, and be able to use them. It is not allowed to use protective equipment and devices with an expired test period.

1.5. The electrician during the period of work must use personal protective equipment (overalls, safety shoes, gloves, glasses, etc.) issued by the administration of the enterprise.

1.6. Each employee, in accordance with Article 4 d of the Fundamentals of the Legislation of the Russian Federation on Labor Protection, has the right to refuse to perform work without any unreasonable consequences for him in the event of an immediate danger to his life and health until this danger is eliminated.

2. Labor protection requirements before starting work

2.1. When testing the insulation of the conductors of communication cables, the personnel must check:

  • work clothes, put them in order, fasten the cuffs of the sleeves. Work clothes must be in good working order and tucked in so that there are no hanging ends. Pick up hair under a tight-fitting headdress;
  • whether the workplace and approaches to it are adequately lit. The light should not blind the eyes. Change of electric lamps to be carried out with the voltage removed;
  • hand tools and accessories necessary for work, personal protective equipment should be laid out in convenient and easily accessible places to exclude the possibility of accidental movement or falling during work.

2.2. When working, use only serviceable, dry and clean tools and fixtures;

  • the blade of the screwdriver must be pulled back and flattened to such a thickness that it enters without a gap into the slot of the screw head;
  • needle nose pliers and pliers should not have chipped, broken jaws, handles. The jaws of the needle nose pliers must be sharp, and the pliers must be properly notched;
  • supports used in manual riveting, crimping, chasing and other work must be strong and safe.

2.4. To carry the tool, the worker should use a special bag or a lightweight portable box. Carrying tools in pockets is prohibited.

2.5. If a malfunction of equipment, tools, accessories for the workplace is detected, both before starting work and during work, inform the foreman and do not start work until the troubleshooting. Defective tools must not be used.

3. Labor protection requirements during work

3.1. Testing the insulation of the cores of communication cables with voltage should be carried out by a team consisting of at least four people (two people in each measured section), one of which is appointed by the test leader. Persons allowed to measure the electrical strength of cable insulation must have an electrical safety group of at least IV. Tests must be carried out side by side.

3.2. For testing, use devices, the housings of which are made of insulating material. Devices with metal cases must be grounded. If it is impossible to carry out grounding, metal devices should be placed in wooden boxes.

3.3. For the connection scheme (between devices and cable cores), flexible multi-core cables with insulation for an operating voltage of at least 5 kV should be used.

3.4. Upon completion of the assembly of the electrical circuit, the equipment must be tested with connecting and measuring cords with voltage. The test site, as well as the connecting wires that are under test voltage during the measurement, must be fenced.

3.5. To prevent the penetration of high voltage to other sections of the cable, all connections between the cable under test and other cables must be removed.

3.6. Persons participating in measurements when testing the electrical strength of the insulation of communication cables and located at different ends of the cable laid in the ground must have a telephone connection that ensures safe testing.

3.7. When testing the cable, the personnel conducting the measurements and the equipment must be outside the pit (well). The ends of the electrical cable must be brought out.

3.8. Before each connection of the high voltage installation to the cable, the test supervisor, located at the end of the cable closest to the measuring equipment, must inform the test participants at the far end by telephone that high voltage is being applied to the cable, and also prohibit any touching of the cable during the measurements. and terminal devices (boxes, terminations) to avoid electric shock.

3.9. On the cable site, the test site, the drum with the cable and the ends of the cable must be fenced. On the fences and at the ends of the cable prepared for testing, a poster "Test, life-threatening" should be posted.

3.10. Before testing, posters warning of the danger of high voltage shock should be hung out on the cable brought into the amplifying points, at the test sites on the input racks and in the boxes.

3.11. After the termination of each test, it is necessary to remove the supply voltage, discharge the capacitors and cable cores on which the tests were carried out. The removal of voltage and charges is controlled by the device. After that, a control check for the absence of charges should be carried out by shorting the wires using a special discharge device (rod).

3.12. On the completion of the tests, the removal of high voltage and charges, the supervisor for their conduct must inform the test participants by phone at the far end of the measuring section.

4. Labor protection requirements in emergency situations

4.1. In case of any accident or emergencies that can lead to an accident and an accident, the electrician is obliged to immediately take all measures within his power to prevent the possibility of damage (destruction) of the object and eliminate the danger to people's lives. At the same time, report the incident to the foreman or immediate supervisor of the work.

5. Labor protection requirements at the end of work

5.1. At the end of all tests, fences and warning posters must be removed. Posters should be removed from the boxes of the tested balanced cable after the cable cores that were not used directly during the tests are discharged. Charges are removed by short-term connection of cable cores or midpoints of linear transformers to ground.

5.2. Store tools and accessories in the designated storage area.

5.3. Tidy up the workplace.

5.5. Wash hands with warm water and soap.

5.6. Report any problems found during operation to the foreman.

 We recommend interesting articles Section Standard instructions for labor protection:

▪ Work with an electric heating installation for the repair of a soft roof. Standard instruction on labor protection

▪ Mechanic for the repair of road construction machines. Standard instruction on labor protection

▪ Grohotnik. Standard instruction on labor protection

See other articles Section Standard instructions for labor protection.

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Artificial leather for touch emulation 15.04.2024

In a modern technology world where distance is becoming increasingly commonplace, maintaining connection and a sense of closeness is important. Recent developments in artificial skin by German scientists from Saarland University represent a new era in virtual interactions. German researchers from Saarland University have developed ultra-thin films that can transmit the sensation of touch over a distance. This cutting-edge technology provides new opportunities for virtual communication, especially for those who find themselves far from their loved ones. The ultra-thin films developed by the researchers, just 50 micrometers thick, can be integrated into textiles and worn like a second skin. These films act as sensors that recognize tactile signals from mom or dad, and as actuators that transmit these movements to the baby. Parents' touch to the fabric activates sensors that react to pressure and deform the ultra-thin film. This ... >>

Petgugu Global cat litter 15.04.2024

Taking care of pets can often be a challenge, especially when it comes to keeping your home clean. A new interesting solution from the Petgugu Global startup has been presented, which will make life easier for cat owners and help them keep their home perfectly clean and tidy. Startup Petgugu Global has unveiled a unique cat toilet that can automatically flush feces, keeping your home clean and fresh. This innovative device is equipped with various smart sensors that monitor your pet's toilet activity and activate to automatically clean after use. The device connects to the sewer system and ensures efficient waste removal without the need for intervention from the owner. Additionally, the toilet has a large flushable storage capacity, making it ideal for multi-cat households. The Petgugu cat litter bowl is designed for use with water-soluble litters and offers a range of additional ... >>

The attractiveness of caring men 14.04.2024

The stereotype that women prefer "bad boys" has long been widespread. However, recent research conducted by British scientists from Monash University offers a new perspective on this issue. They looked at how women responded to men's emotional responsibility and willingness to help others. The study's findings could change our understanding of what makes men attractive to women. A study conducted by scientists from Monash University leads to new findings about men's attractiveness to women. In the experiment, women were shown photographs of men with brief stories about their behavior in various situations, including their reaction to an encounter with a homeless person. Some of the men ignored the homeless man, while others helped him, such as buying him food. A study found that men who showed empathy and kindness were more attractive to women compared to men who showed empathy and kindness. ... >>

Random news from the Archive

Winkel Board Developer Board 14.12.2016

Mintbox Technologies has launched a fundraising campaign for the release of the Winkel Board, designed for development and prototyping. The upcoming novelty features a high degree of integration and support for the main wireless interfaces that may be required in such projects.

The Winkel Board is based on an Atmel Atmega128 microcontroller with 128 KB flash and 4 KB SRAM. The controller is compatible with the Arduino IDE development environment, but unlike the boards of the same name, the new product already has an Espressif ESP8266 wireless module with Wi-Fi 802.11 b/g/n support and an Itead HC-05 module that supports Bluetooth 2.0 with EDR. Atmel and Espressif controllers are connected by UART bus and can execute code independently from each other. There is a Nordic nRF24L01 radio transceiver operating in the ISM band, as well as a DS3231 real time clock. MPU-6050 accelerometer and gyroscope daughterboard can be connected.

The Winkel Board has a total of 38 digital and 8 analog input/output connectors; a microUSB port is wired for power and programming. The minimum fee for owning a board with two microcontrollers is $21, the Atmega128 version is priced at $12.

Other interesting news:

▪ Oil and gas flares are more dangerous than thought

▪ Heat reduces school performance

▪ The cup changes the taste of tea

▪ Room lock is opened by smartphone

▪ plastic muscles

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ section of the site for the Builder, home craftsman. Selection of articles

▪ article by Lucius Apuleius. Famous aphorisms

▪ article When did the first Slavic states arise? Detailed answer

▪ article Cylinder filler and receiver. Standard instruction on labor protection

▪ article So is it possible to protect caller ID from failures? Encyclopedia of radio electronics and electrical engineering

▪ article Map hanging in the air. Focus Secret

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024