Job description for project cost manager. Full document

Occupational Safety and Health

Occupational Safety and Health / Job descriptions

Comments on the article Comments on the article

I. General Provisions

  1. The project cost manager reports directly to _______.
  2. The project cost manager follows the instructions of _______.
  3. The Project Cost Manager replaces _______.
  4. The project cost manager is replaced by _______.
  5. Documents regulating the work:
  • External documents: Legislative and regulatory acts, other guidance, methodological and regulatory materials on planning, accounting and analysis of the financial activities of the enterprise.
  • Internal documents: Regulations of the company, Regulations on management, Job description, Internal labor regulations, Temporary regulations on work with projects.
  1. Qualification requirements:
  • education: higher professional (economic, financial);
  • skills: PC (MS Office package, e-mail); knowledge of MS Project, Project Expert; Knowledge of group 1 programs.
  • work experience: from two years as a financial analyst, economist at a manufacturing and trading enterprise.
  • professional knowledge: business planning; planning of production activities; the financial analysis; budgeting.

II. Official duties

  1. Estimates the cost of resources required to complete the project:
  • calculates the cost, production and non-production costs, the profitability of a new product, determines the order of magnitude of investments in the project, calculates the main indicators of the project's effectiveness;
  • develops a financial model of a new product, calculates the cost, profitability and profit of a new product, draws up forecast forms of financial statements (profit and loss statement, cash flow statement, balance sheet), determines a budget estimate for approving budgets.
  1. Draws up a basic cost plan for the project, relative to which the cost of performing work in the project will be measured:
  • prepares the project budget;
  • tracks the cost of the project over time (composes the S-curve of the project).
  1. Controls and manages the cost of the project:
  • analyzes tangible and intangible costs, profits and profitability for new products;
  • conducts a monthly cost analysis of the project, ascertains changes (deviations from the base cost of the project);
  • manages changes as they occur;
  • influences the factors that cause change to ensure that change is appropriate and consistent.
  1. Performs other duties within the project.
  2. Administrative work:
  • budgeting: develops, agrees and controls project budgets.
  • scheduling: daily, monthly (until the 23rd).
  • reporting: monthly (until the 23rd day).
  • development of documents: development of reporting forms for the Financial Analysis and Planning Department, specialists of the Innovation and Development Department providing information.
  • maintains up-to-date information, databases: recipes for products (basic and interchangeable), production costs (rent, depreciation, wages, etc.), prices for raw materials used, marketing and advertising costs, prices for new products, profit and profitability on new products.

III. Rights

The project cost manager has the right to:

  1. give assignments to subordinate employees, tasks on a range of issues included in his functional duties.
  2. supervise the timely execution of individual orders by subordinate employees.
  3. request and receive the necessary materials and documents related to the issues of its activities and the activities of employees subordinate to it.
  4. interact with other services of the enterprise on production and other issues that are part of its functional duties.
  5. get acquainted with the draft decisions of the management of the enterprise regarding the activities of the Division.
  6. propose for consideration by the manager proposals for improving the work related to the duties provided for in this Job Description.
  7. submit for consideration by the head of the proposal on the promotion of distinguished employees, the imposition of penalties on violators of production and labor discipline.
  8. report to the manager on all identified violations and shortcomings in connection with the work performed.

IV. A responsibility

The project cost manager is responsible for:

  • for improper performance or non-performance of their official duties provided for by this Job Description - within the limits determined by the labor legislation of Ukraine.
  • for violation of the rules and regulations governing the activities of the enterprise.
  • for offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of Ukraine.
  • for causing material damage - within the limits determined by the current labor and civil legislation of Ukraine.
  • for compliance with current instructions, orders and orders for the preservation of trade secrets and confidential information.
  • for compliance with internal regulations, safety and fire safety rules.

 We recommend interesting articles Section Job descriptions:

▪ Warehouse coordinator. Job description

▪ Office manager. Job description

▪ Automatic lines adjuster. Job description

See other articles Section Job descriptions.

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Machine for thinning flowers in gardens 02.05.2024

In modern agriculture, technological progress is developing aimed at increasing the efficiency of plant care processes. The innovative Florix flower thinning machine was presented in Italy, designed to optimize the harvesting stage. This tool is equipped with mobile arms, allowing it to be easily adapted to the needs of the garden. The operator can adjust the speed of the thin wires by controlling them from the tractor cab using a joystick. This approach significantly increases the efficiency of the flower thinning process, providing the possibility of individual adjustment to the specific conditions of the garden, as well as the variety and type of fruit grown in it. After testing the Florix machine for two years on various types of fruit, the results were very encouraging. Farmers such as Filiberto Montanari, who has used a Florix machine for several years, have reported a significant reduction in the time and labor required to thin flowers. ... >>

Advanced Infrared Microscope 02.05.2024

Microscopes play an important role in scientific research, allowing scientists to delve into structures and processes invisible to the eye. However, various microscopy methods have their limitations, and among them was the limitation of resolution when using the infrared range. But the latest achievements of Japanese researchers from the University of Tokyo open up new prospects for studying the microworld. Scientists from the University of Tokyo have unveiled a new microscope that will revolutionize the capabilities of infrared microscopy. This advanced instrument allows you to see the internal structures of living bacteria with amazing clarity on the nanometer scale. Typically, mid-infrared microscopes are limited by low resolution, but the latest development from Japanese researchers overcomes these limitations. According to scientists, the developed microscope allows creating images with a resolution of up to 120 nanometers, which is 30 times higher than the resolution of traditional microscopes. ... >>

Air trap for insects 01.05.2024

Agriculture is one of the key sectors of the economy, and pest control is an integral part of this process. A team of scientists from the Indian Council of Agricultural Research-Central Potato Research Institute (ICAR-CPRI), Shimla, has come up with an innovative solution to this problem - a wind-powered insect air trap. This device addresses the shortcomings of traditional pest control methods by providing real-time insect population data. The trap is powered entirely by wind energy, making it an environmentally friendly solution that requires no power. Its unique design allows monitoring of both harmful and beneficial insects, providing a complete overview of the population in any agricultural area. “By assessing target pests at the right time, we can take necessary measures to control both pests and diseases,” says Kapil ... >>

Random news from the Archive

Loudest bird on earth found 22.10.2019

A group of ornithologists from the United States and Brazil have announced that the one-horned bell ringer Procnias albus, which lives in the forests of the Amazon, is the loudest bird on Earth. Males of these birds can produce a sound at least nine decibels higher than the previous record.

Male ringers are painted bright white and are distinguished by a long "whisker" above the beak. Attracting females, they sing songs, the volume of which can reach 125 decibels. For comparison, the volume of a fire siren is 100 decibels, and near the working engines of an aircraft, the sound reaches 120 decibels.

The previous record was held by the noisy Lipaugus vociferans. In the course of the study, the scientists measured the volume of singing of three fir and eight ringers in natural conditions and from different distances, accurately fixing the distance to the bird. This made it possible to calculate the volume that 250-gram single-whiskered bell ringers are capable of and set a new record. The authors note that small birds are perfectly adapted for loud songs, they are distinguished by thick “press” muscles and the ability to open their beaks especially wide.

It should be noted that the "songs" of the ringers do not differ in duration or melody. They lure females with a sequence of short calls. Moreover, unlike other animals that are capable of making loud sounds, bell ringers do not use them to communicate over long distances.

Other interesting news:

▪ Before the event, envy is stronger

▪ Dogs, like people, can experience anxiety.

▪ Music is the secret of children's progress

▪ Genetic weapon

▪ Salads are healthier with fat sauce

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ section of the site Winged words, phraseological units. Selection of articles

▪ article by Henry James. Famous aphorisms

▪ How was smokeless powder invented? Detailed answer

▪ article Dymyanka officinalis. Legends, cultivation, methods of application

▪ article Temperature and Humidity Stabilizer. Encyclopedia of radio electronics and electrical engineering

▪ article Automatic prefix to the charger. Encyclopedia of radio electronics and electrical engineering

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024