Norms of acceptance tests. Oil circuit breakers

Free technical library

Encyclopedia of radio electronics and electrical engineering / Rules for the installation of electrical installations (PUE)

Comments on the article Comments on the article

1.8.19. 1. Insulation resistance measurement:

a) moving and guiding parts made of organic materials. Produced with a megohmmeter for a voltage of 2500 V.

The insulation resistance must not be less than the values ​​given below:

Rated voltage of the circuit breaker, kV 3-10 15-150 220-500
Insulation resistance, MOhm 1000 3000 5000

b) secondary circuits, electromagnets for switching on and off, etc. Produced in accordance with 1.8.37.

2. Testing of inputs.

Produced in accordance with 1.8.34.

3. Assessment of the state of intra-tank insulation and insulation of arc extinguishing devices.

The assessment is made for tank oil circuit breakers for a voltage of 35 kV if, when measuring tg δ of the bushings on a fully assembled circuit breaker, higher values ​​​​are obtained compared to the standards given in Table 1.8.30.

Intra-tank insulation and insulation of arc extinguishers must be dried if the exclusion of the influence of this insulation reduces the measured tg δ by more than 4% (absolute value).

4. Insulation test with increased voltage of industrial frequency:

a) isolation of switches relative to the body or support insulation. Produced for switches with voltage up to 35 kV. The test voltage for switches is taken in accordance with the data in Table 1.8.16. The duration of application of the normalized test voltage is 1 min.

The insulation of intercontact gaps of oil circuit breakers 6-10 kV should be subjected to a similar test.

b) isolation of secondary circuits and windings of electromagnets of switching on and off. The value of the test voltage is 1 kV. The duration of application of the normalized test voltage is 1 min.

5. DC resistance measurement:

a) contacts of oil switches. The resistance of the current-carrying system of the pole of the switch and its individual elements is measured. The DC contact resistance value must correspond to the manufacturer's data;

b) shunt resistors of arcing devices. The measured resistance value should differ from the factory data by no more than 3%;

c) windings of electromagnets of switching on and off, the resistance value of the windings must comply with the instructions of the manufacturers.

6. Measurement of time characteristics of switches.

Time characteristics are measured for circuit breakers of all voltage classes. Measurement of making and breaking speed should be made for breakers of 35 kV and above, when required by the manufacturer's instructions. The measured characteristics must be in accordance with the manufacturer's instructions.

7. Measurement of the travel of the moving parts (traverse) of the circuit breaker, pressing the contacts when turned on, simultaneous closing and opening of the contacts.

The values ​​obtained must comply with the manufacturer's instructions.

8. Checking the adjustment and installation characteristics of mechanisms, drives and switches.

It is produced in the scope and according to the norms of the manufacturers' instructions and passports for each type of drive and circuit breaker.

9. Checking the operation of the free release mechanism.

The drive free tripping mechanism must allow for tripping operations over the entire course of the contacts, i.e. at any time from the start of the power-on operation.

10. Checking the minimum voltage (pressure) of the circuit breakers.

The check of the minimum operating voltage is carried out pole by pole for circuit breakers with pole drives.

The minimum operating voltage must comply with the standards established by the manufacturers of the switches. The value of the actuation pressure of the pneumatic actuators must be 20-30% less than the lower limit of the working pressure.

11. Testing switches by multiple trials.

Multiple testing of circuit breakers - performing closing and opening operations and complex cycles (CO without time delay is mandatory for all circuit breakers; OB and OVO are mandatory for circuit breakers designed to operate in the AR mode) should be carried out at rated voltage at the terminals of the electromagnets. The number of operations and complex cycles to be performed by the circuit breaker must be:

  • 3-5 turn-on and turn-off operations;
  • 2-3 cycles of each type.

12. Testing transformer oil switches.

For tank circuit breakers of all voltage classes and low-volume circuit breakers of 110 kV and above, oil testing is carried out before and after oil is poured into the circuit breakers.

For low-volume circuit breakers up to 35 kV, the oil is tested before being poured into the arc chutes. Oil testing is carried out in accordance with Table 1.8.33, paragraphs 1, 3, 4, 5.

13. Testing of built-in current transformers.

Produced in accordance with 1.8.17.

Table 1.8.16. Power frequency test voltage for external insulation of apparatus

Voltage class, kV Test voltage, kV, for devices with insulation
normal ceramic normal organic lightweight ceramic lightweight organic
3 24 21,6 13 11,7
6 32 28,8 21 18,9
10 42 37,8 32 28,8
15 55 49,5 48 43,2
20 65 58,5 - -
35 95 85,5 - -

See other articles Section Rules for the installation of electrical installations (PUE).

Read and write useful comments on this article.

<< Back

Latest news of science and technology, new electronics:

Machine for thinning flowers in gardens 02.05.2024

In modern agriculture, technological progress is developing aimed at increasing the efficiency of plant care processes. The innovative Florix flower thinning machine was presented in Italy, designed to optimize the harvesting stage. This tool is equipped with mobile arms, allowing it to be easily adapted to the needs of the garden. The operator can adjust the speed of the thin wires by controlling them from the tractor cab using a joystick. This approach significantly increases the efficiency of the flower thinning process, providing the possibility of individual adjustment to the specific conditions of the garden, as well as the variety and type of fruit grown in it. After testing the Florix machine for two years on various types of fruit, the results were very encouraging. Farmers such as Filiberto Montanari, who has used a Florix machine for several years, have reported a significant reduction in the time and labor required to thin flowers. ... >>

Advanced Infrared Microscope 02.05.2024

Microscopes play an important role in scientific research, allowing scientists to delve into structures and processes invisible to the eye. However, various microscopy methods have their limitations, and among them was the limitation of resolution when using the infrared range. But the latest achievements of Japanese researchers from the University of Tokyo open up new prospects for studying the microworld. Scientists from the University of Tokyo have unveiled a new microscope that will revolutionize the capabilities of infrared microscopy. This advanced instrument allows you to see the internal structures of living bacteria with amazing clarity on the nanometer scale. Typically, mid-infrared microscopes are limited by low resolution, but the latest development from Japanese researchers overcomes these limitations. According to scientists, the developed microscope allows creating images with a resolution of up to 120 nanometers, which is 30 times higher than the resolution of traditional microscopes. ... >>

Air trap for insects 01.05.2024

Agriculture is one of the key sectors of the economy, and pest control is an integral part of this process. A team of scientists from the Indian Council of Agricultural Research-Central Potato Research Institute (ICAR-CPRI), Shimla, has come up with an innovative solution to this problem - a wind-powered insect air trap. This device addresses the shortcomings of traditional pest control methods by providing real-time insect population data. The trap is powered entirely by wind energy, making it an environmentally friendly solution that requires no power. Its unique design allows monitoring of both harmful and beneficial insects, providing a complete overview of the population in any agricultural area. “By assessing target pests at the right time, we can take necessary measures to control both pests and diseases,” says Kapil ... >>

Random news from the Archive

Corsair Virtuoso RGB Wireless XT Headset 21.05.2021

Corsair has introduced the Virtuoso RGB Wireless XT gaming headset, which the manufacturer itself refers to as a premium class.

The novelty supports ultra-fast wireless connection SlipStream. At the same time, you can use a standard Bluetooth connection with the Qualcomm aptX HD codec. USB wired digital connection and the most versatile 3,5mm analog connection available.

The reproducible frequency range is declared equal to 20-40 Hz. There is support for Dolby Atmos surround sound. The headphones use 000mm drivers. The sensitivity of the headphones is 50+-109 dB, the impedance is 3 ohms.

The Virtuoso RGB Wireless XT features a detachable "broadcast-grade" omnidirectional microphone with a frequency response of 100-10 Hz. The sensitivity of the microphone is -000 + -42 dB.

One battery charge is enough for 15 hours of wireless operation. The headset is adorned with RGB lighting, customizable in the iCUE app. The price of the new item is $270.

Other interesting news:

▪ Hear the molecules

▪ When Europe Was Deserted

▪ Wireless speaker Drifter

▪ Infineon unveils world's smallest GPS receiver

▪ Mars and its volcanic past

News feed of science and technology, new electronics

 

Interesting materials of the Free Technical Library:

▪ site section Power Amplifiers. Article selection

▪ article English for physicians. Lecture notes

▪ article What kind of true friend did the dance teacher have? Detailed answer

▪ article Programmer of trade enterprise. Job description

▪ article Signal Generator. Encyclopedia of radio electronics and electrical engineering

▪ article Predicted amount. Focus Secret

Leave your comment on this article:

Name:


Email (optional):


A comment:





All languages ​​of this page

Home page | Library | Articles | Website map | Site Reviews

www.diagram.com.ua

www.diagram.com.ua
2000-2024